Shenzhen Happy Valley apologized for the rear end of the sightseeing bus: outage and contact with experts

category:Society click:440
 Shenzhen Happy Valley apologized for the rear end of the sightseeing bus: outage and contact with experts


In the afternoon, Shenzhen overseas Chinese town Happy Valley tourism company released micro-blogs apology and sympathy to the injured person.

This picture is read special.

Happy Valley Company sent a brochure to the reader who took the lead in reporting the incident, giving a more detailed description of the incident. The instructions said that there was a rear-end collision between No. 3 and No. 4 at 11:09 a.m. on the first day. Fourteen of the 20 passengers on the train left after they were confirmed to be safe and six were sent to the doctor for examination. After the incident, Happy Trunk Line has been shut down and contacted with the national special equipment testing institutions and project manufacturers for investigation. The reasons need to be clarified by the testing agencies and notified separately.

The specific process of the incident is as follows:

At 10:42 a.m. on Nov. 1, Happy Trunk Line General Control Room found that the No. 3 train was out of order when it was running 150 meters west of the seaside platform. At the same time, follow up No. 4 car starts safe mode to stop automatically. Staff immediately start emergency plans, suspend trunk line operations and send maintenance personnel to the scene to remove obstacles. Ten minutes later, trunk maintenance personnel arrived at the fault site of No. 3. After confirming that the safe distance between No. 3 and No. 4 is about 40 meters, they adopted manual control mode to prepare to drive No. 3 to the seaside platform to evacuate passengers.

At 11:09, the maintenance personnel drove the No. 3 vehicle manually to the seaside platform for about 15 meters. The subsequent No. 4 vehicle started by itself and rear-ended with No. 3 vehicle.

At 11:32, a total of 20 passengers from two cars were safely evacuated to the beach platform.

At 11:50, 20 passengers arrived safely on the ground, 14 of whom left on their own after being confirmed unhindered and 6 were sent to the hospital for medical examination. Up to now, the injured are in stable condition. One person suffered from facial bruises, the other one suffered a rib injury and was hospitalized. One person was accompanied by the hospital, and the other three left on their own after examination. Happy Valley of Shenzhen Overseas Chinese City said that Happy Trunk Line is a well-developed tourist project imported from abroad, with a speed of 8 kilometers per hour and safe operation for many years, which is widely welcomed by tourists. After the incident, the company immediately took the Happy Trunk Line out of service, and has contacted the national special equipment testing institutions and project manufacturers for investigation, the reasons to be found out by the testing agencies will be notified separately. At the same time, I would like to express my sincere apology and condolences to the injured passengers in the incident. I will do a good job in the treatment and accompanying of the medical staffs throughout the whole process, and do a good job in the follow-up treatment. Source: Shenzhen Special Administrative Region editor: Gu Ying _NN6577

At 11:50, 20 passengers arrived safely on the ground, 14 of whom left on their own after being confirmed unhindered and 6 were sent to the hospital for medical examination. Up to now, the injured are in stable condition. One person suffered from facial bruises, the other one suffered a rib injury and was hospitalized. One person was accompanied by the hospital, and the other three left on their own after examination.

Happy Valley of Shenzhen Overseas Chinese City said that Happy Trunk Line is a well-developed tourist project imported from abroad, with a speed of 8 kilometers per hour and safe operation for many years, which is widely welcomed by tourists. After the incident, the company immediately took the Happy Trunk Line out of service, and has contacted the national special equipment testing institutions and project manufacturers for investigation, the reasons to be found out by the testing agencies will be notified separately. At the same time, I would like to express my sincere apology and condolences to the injured passengers in the incident. I will do a good job in the treatment and accompanying of the medical staffs throughout the whole process, and do a good job in the follow-up treatment.