Heavy snowfall in Shanxi delayed the speed limit operation of Daxi high speed railway

category:Society
 Heavy snowfall in Shanxi delayed the speed limit operation of Daxi high speed railway


At 7:36 a.m., Shanxi Provincial Meteorological Bureau issued a yellow blizzard warning. Affected by this, the EMU trains arriving at Taiyuan South Railway Station began to be delayed in a small range from 11:00 a.m. up to now, there are several EMU trains in Taiyuan South Railway Station affected by the weather in varying degrees, leading to the delay. Taiyuan South Railway Station adopted the original price refund for the passengers who stopped the operation of Daxi high-speed railway and delayed trains And endorsement change measures.

Taiyuan South Railway Station launched the emergency plan of railway passenger plane in time to ensure the safety of high-speed rail passenger transportation. Ren Lina photo

(function() {(window. Slotbydup = window. Slotbydup| []). Push ({ID: u5811557, container: ssp_, async: true});}) (); since 10 a.m., a large number of passengers have changed to travel by train due to the influence of highway and Airport closure. Taiyuan South railway station starts the emergency plan for large passenger flow in time. According to the passenger flow situation, it dynamically adjusts and opens the real name verification ports, security inspection channels and ticket windows of the East and West squares in real time to ensure that the passengers enter the station and wait for the train in time. Up to now, 12 ticket windows have been opened in the East and West ticket offices of Taiyuan South Railway Station to handle ticket refunds and ticket changes for passengers in time. Source: responsible editor of China News Network: Du Shuo, nb12556

Since 10 a.m., affected by the closure of expressways and airports, a large number of passengers have changed to take trains. Taiyuan South railway station starts the emergency plan for large passenger flow in time. According to the passenger flow situation, it dynamically adjusts and opens the real name verification ports, security inspection channels and ticket windows of the East and West squares in real time to ensure that the passengers enter the station and wait for the train in time.

Up to now, 12 ticket windows have been opened in the East and West ticket offices of Taiyuan South Railway Station to handle ticket refunds and ticket changes for passengers in time.