Residents open to traffic under Wuxi rollover bridge: overloading of large trucks was common before the accident

category:Hot
 Residents open to traffic under Wuxi rollover bridge: overloading of large trucks was common before the accident


Poster direct hit

At 6 oclock on October 12, about 36 hours after the overturning accident of the upper bridge deck in Wuxi, the road surface under the bridge was restored to traffic. The scene pictures show that the traffic police set up temporary signal lights in the middle of the road, and vehicles and pedestrians pass under the bridge in an orderly manner according to the traffic signals. However, the traffic on the bridge deck is still not open, and bare reinforcement bars can be seen at the broken ends of the bridge. At about 18 oclock on the 10th, the overpass bridge deck rollover caused 3 deaths and 2 injuries. After preliminary analysis, the accident was caused by overloading of transport vehicles.

Initial Identification of the Main culprit in the Opening of Ground Road at Wuxi Elevated Rollover Site